The Land Development group is responsible for the review of entitlement applications, building permits, public improvement plans (street, traffic, storm drain, street lights, landscaping, etc.), traffic control plans, traffic studies, land subdivision applications (tentative, parcel and final maps), lot mergers and lot line adjustments, easements, public right-of-way vacations (street, alley, easements), certificate of compliance and certificate of correction applications. This group is responsible for offsite improvements cost estimates approval, bonds preparation, contractor’s insurance verification, and the issuance of all permits affecting the public right-of-way (construction, dry utilities, encroachments).
Street Lighting Design Guidelines 2024
Standard Drawings
Submittal Procedure - Certificate of Compliance
Submittal Procedure - Subdivision Map
Submittal Procedure - Street Alley Vacation
Submittal Procedure - Lot Line Adjustment
Submittal Procedure - Lot Merger
Submittal Procedure - Easement Vacation
Submittal Procedure - Easement City as Grantor
Submittal Procedure - Easement City as Grantee
Tentative Parcel/Tract Map Check List
Water Cost Estimate Template
USPS - New Growth Submission Process
Request for Infrastructure Information
Request for Exemption of Underground Utilities
Public Water Engineering Plan Check Processes
Cost Estimate - Public Improvement without water
BMPs Pamphlet
Approved Authorized Signers Documents
Street Lights
LED standard - 100W HPS Equivalent Residential
LED standard - 150W HPS Equivalent Collector
LED standard - 200W HPS Equivalent Arterial
LED standard - 250W HPS
LED standard - 400W HPS
Stormwater
SUSMP Checklist Template
SUSMP Owner Certification
SUSMP Maintenance Covenant
Utilities
Standard Drawings - Water
Standard Drawings - Sewer
WRD Building Permit Review Form
Fire Flow Request Form
Fixture Unit Determination Form
Letter of Authorization Form
Utility Service Account Application
Construction Meter Application
General Notes
General Notes - Grading plans
General Notes - Street Improvement plans
General Notes - Traffic Signal plans
General Notes - Signing and Striping Plans
General Notes - Water
General Notes - Sewer
General Notes - Traffic Control plans
Title Blocks
Title Block - Grading Plan
Title Block - Street Plan
Title Block - Water & Sewer Plan